The final steps of our 300 SL build add the Compressor to the engine bay during Phase 100!
Category Archives: BUILD
Phase 99
We finish off the Muffler and add the Tailpipe Trim with Phase 99!
Phase 98
The Battery Box (Fuel Tank) Cover is attached in Phase 98!
Phase 97
The Undertray assembly is completed and attached to the bottom of our 300 SL with Phase 97!
Phase 96
We add the Exhaust Pipe to the Center Undertray during Phase 96!
Phase 95
While the Center Undertray arrives in Phase 95, we do not do anything with it yet!
Phase 94
The first of many Undertray panels are attached in Phase 94!
Phase 93
In Phase 93, the opposing Right Sill Rocker Panel is installed completing our body assembly!
Phase 92
The Left Sill Rocker Panel and Trim are attached during Phase 92!
Phase 91
We add the Battery Box and test the lights of our 300 SL with Phase 91!